The birth of an idea. Franz Hauk and the Engineering Team developing the escape gangways project |
![]() |
The first step. Setting up the template for the gangway frame. |
![]() |
Production of the gangway frame. |
![]() |
Productive logistics - Numbers are growing... |
![]() |
The finished gangway frame. |
![]() |
Adjusting the roller mechanism. |
![]() |
The roller systems slide smoothly along the track. |
![]() |
Production, programming and testing of the control electronics. |
![]() |
Delivery of the gangway frame to the Olympic Stadium. |
![]() |
The gangways are pushed into the openings, followed by an initial test of the gangway mechanism. |
![]() |
Delivery of the gangway gates. |
![]() |
Assembly and adjustment of the gangway gates. |
![]() |
The closed gangway: No interruption to the ditch or the barrier. |
![]() |
The gangway is activated. The gates open and form the side railings. |
![]() |
The gangway is now accessible. |
![]() |
Free access to the pitch in just 13 seconds. |
![]() |
The gangways are retracted and closed - there is no obstruction to the surrounding ditch; the barrier and glass railing are closed. |
![]() |
The gangways are activated and open - 29 unobstructed access routes to the pitch |
![]() |
The complete open gangway. |
![]() |
The gangway extends and bridges the ditch. |
![]() |
The gangway creates a link from the stands to the pitch again. |
![]() |
|
![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||